Zorlu Enerji, Catalytic Converter Supply and Installation
Zorlu Enerji, Catalytic Converter Supply and Installation

We supplied catalytic convertor that are aimed at protecting the environmental health through reduction of emissions.

More Details
Danone Kırklareli 1.16 MWe Cogeneration Power Plant
Danone Kırklareli 1.16 MWe Cogeneration Power Plant

Cogeneration plant with heat recovery of 1,16 MWe has been successfully commissioned on turnkey basis including the engineering services. 

More Details
Zeus Enerji, 12 MWe Steam Turbine Supply
Zeus Enerji, 12 MWe Steam Turbine Supply

A 12 MWe steam turbine was supplied to our customer, which provides services for the conversion of biomass to energy by burning it under suitable conditions.

More Details
Prekons, Cold Room Containers – Basra Shell Company Iraq
Prekons, Cold Room Containers – Basra Shell Company Iraq

We supplied 8x40 feet cold room containers to the company in Iraq. 

More Details
Istanbul Municipality Istac Odayeri Medical Waste Facility 0.54 MWe Steam Turbine Supply
Istanbul Municipality Istac Odayeri Medical Waste Facility 0.54 MWe Steam Turbine Supply

0,54 MWe steam turbine has been supplied for the power plant that generates energy through incineration of medical wastes collected from the healthcare facilities in Istanbul. 

More Details
Denizli Uğurlular Biomass, 2.9 MWe Steam Turbine Supply
Denizli Uğurlular Biomass, 2.9 MWe Steam Turbine Supply

We supplied 2,9 MWe steam turbine for the plant generating electrical power from incineration of organic wastes.

More Details
Birlik Enerji (Yapılcanlar) Aksaray, 10 MWe Steam Turbine Supply and Installation
Birlik Enerji (Yapılcanlar) Aksaray, 10 MWe Steam Turbine Supply and Installation

We completed electrical, mechanical turbine and pipe installation of the steam turbine with 10 MWe power for the purpose of generating electricity from organic wastes. 

More Details
Envio Enerji, Duzce and Ağrı Provinces Landfill Gas Facility Power Plants
Envio Enerji, Duzce and Ağrı Provinces Landfill Gas Facility Power Plants

Commissioning works have been completed for gas powered container packages that will be used to generate power from garbage gas in Duzce and Agri, in addition to design, engineering and production works. 

More Details
Can Enerji, Catalytic Converter Supply and Installation
Can Enerji, Catalytic Converter Supply and Installation

We successfully supplied and installed the catalytic converter equipment that reduces emission values and contributes to environment-friendly applications.

More Details
Can Enerji, 4.2 MWe Steam Turbine Supply
Can Enerji, 4.2 MWe Steam Turbine Supply

We successfully supplied and installed 4,2 MWe steam turbine for the plant in Tekirdağ. 

More Details
Cemak Enerji, 6 MWe Steam Turbine Supply and Installation
Cemak Enerji, 6 MWe Steam Turbine Supply and Installation

Supply and installation operations of 6 MWe steam turbine have been completed for a production plant based on generation of electricity through incineration of biomass wastes. 

More Details
Ekomas A.Ş., 10MWe Steam Turbine Supply and Installation
Ekomas A.Ş., 10MWe Steam Turbine Supply and Installation

We completed and successfully commissioned 10 MWe steam turbine installation and piping works for Ekomas Enerji in Kirklareli OSB that generates electrical energy by incinerating the organic wastes. 

More Details
Gentaş Kimya, 2.35 MWe Steam Turbine Supply and Installation
Gentaş Kimya, 2.35 MWe Steam Turbine Supply and Installation

We successfully supplied and installed 2,35 MWe steam turbine for the company that is a leading company in Turkish chemicals sector in production of formaldehyde and formaldehyde resins.

More Details
Fabay Enerji, 12 MWe Steam Turbine Supply
Fabay Enerji, 12 MWe Steam Turbine Supply

We supplied 12 MWe steam turbine for the customer generating electrical power from incineration of organic wastes.

More Details
Satem Elektrik, 12 MWe Steam Turbine Supply and Installation
Satem Elektrik, 12 MWe Steam Turbine Supply and Installation

We successfully supplied and installed 12 MWe steam turbine for the biomass fuelled plant in Sinop.

More Details
Sarkuysan, 0,8 MWe Steam Turbine Supply and Installation
Sarkuysan, 0,8 MWe Steam Turbine Supply and Installation

We ensured that the power plant of our customer works in combined cycle thanks to this plant that generates 0,8 MWe energy from waste heat.

More Details
Kardemir Karabük Demir Çelik, 30 MWe Steam Turbine Supply
Kardemir Karabük Demir Çelik, 30 MWe Steam Turbine Supply

30 MWe steam turbine has been supplied to use generated the waste heat in melting furnaces.

More Details
Durum Gıda, 8 MWe Steam Turbine Supply and Installation
Durum Gıda, 8 MWe Steam Turbine Supply and Installation

We supplied and installed 8 MWe steam turbine for using in the process. We are providing support to our customer under AMC (Annual Maintenance Contract). 

More Details
Bientaş Madencilik, 13,33 MWe MWe Steam Turbine Supply and Installation
Bientaş Madencilik, 13,33 MWe MWe Steam Turbine Supply and Installation

We timely commissioned 13,33 MWe steam turbine installation and piping works for Bientas Madencilik that the part of Biberci Group of Companies in Konya.

More Details
KMK Kağıt, 10.7 MWe Steam Turbine Supply and Installation
KMK Kağıt, 10.7 MWe Steam Turbine Supply and Installation

In Kahramanmaras, we supplied and installed 10,7 MWe steam turbine for the biomass plant that converts the heat obtained from incineration of wastes generated in the paper plant into electrical power. 

More Details