We supplied catalytic convertor that are aimed at protecting the environmental health through reduction of emissions.
More DetailsCogeneration plant with heat recovery of 1,16 MWe has been successfully commissioned on turnkey basis including the engineering services.
More DetailsA 12 MWe steam turbine was supplied to our customer, which provides services for the conversion of biomass to energy by burning it under suitable conditions.
More DetailsWe supplied 8x40 feet cold room containers to the company in Iraq.
More Details0,54 MWe steam turbine has been supplied for the power plant that generates energy through incineration of medical wastes collected from the healthcare facilities in Istanbul.
More DetailsWe supplied 2,9 MWe steam turbine for the plant generating electrical power from incineration of organic wastes.
More DetailsWe completed electrical, mechanical turbine and pipe installation of the steam turbine with 10 MWe power for the purpose of generating electricity from organic wastes.
More DetailsCommissioning works have been completed for gas powered container packages that will be used to generate power from garbage gas in Duzce and Agri, in addition to design, engineering and production works.
More DetailsWe successfully supplied and installed the catalytic converter equipment that reduces emission values and contributes to environment-friendly applications.
More DetailsWe successfully supplied and installed 4,2 MWe steam turbine for the plant in Tekirdağ.
More DetailsSupply and installation operations of 6 MWe steam turbine have been completed for a production plant based on generation of electricity through incineration of biomass wastes.
More DetailsWe completed and successfully commissioned 10 MWe steam turbine installation and piping works for Ekomas Enerji in Kirklareli OSB that generates electrical energy by incinerating the organic wastes.
More DetailsWe successfully supplied and installed 2,35 MWe steam turbine for the company that is a leading company in Turkish chemicals sector in production of formaldehyde and formaldehyde resins.
More DetailsWe supplied 12 MWe steam turbine for the customer generating electrical power from incineration of organic wastes.
More DetailsWe successfully supplied and installed 12 MWe steam turbine for the biomass fuelled plant in Sinop.
More DetailsWe ensured that the power plant of our customer works in combined cycle thanks to this plant that generates 0,8 MWe energy from waste heat.
More Details30 MWe steam turbine has been supplied to use generated the waste heat in melting furnaces.
More DetailsWe supplied and installed 8 MWe steam turbine for using in the process. We are providing support to our customer under AMC (Annual Maintenance Contract).
More DetailsWe timely commissioned 13,33 MWe steam turbine installation and piping works for Bientas Madencilik that the part of Biberci Group of Companies in Konya.
More DetailsIn Kahramanmaras, we supplied and installed 10,7 MWe steam turbine for the biomass plant that converts the heat obtained from incineration of wastes generated in the paper plant into electrical power.